Saturday, April 20, 2013

Excavation

The road packer was delivered about 9:00 AM on Friday and we were able to pack entire building site this makes for a very solid base for the foundation..  The elevations are looking pretty good at this point the packed area is the bottom of the footing,  the top of the floor in the great room will be 2' 8" above the packed area.   The garage floor will be 7 ' below the packed area so there is still lots of material to remove.

(Looks like my camera lens picked up a couple of the rain drops from the sun shower!)