Concrete Walls

The weather was perfect for Monday and we poured the concrete walls, overall this was a difficult pour with multiple drops, a 4 way corner, two flying grade beams and plenty of custom steel in the engineered walls.  We will strip the forms on Wednesday; foundation coating is set for Wednesday evening.  Steel beams are scheduled for pick-up on Thursday with installation for Friday.  Floor joists are ready Monday but we may delay for a day to allow for preping all the steel beams.